skip to main content

Evaluasi Pemenuhan Nilai Kepadatan (Density) Campuran Beraspal pada Pekerjaan Jalan

*Bagus Hario Setiadji  -  Program Studi Program Profesi Insinyur Fakultas Teknik, Universitas Diponegoro, Jl. Prof. Sudarto, SH, Tembalang, Semarang, Indonesia 50275, Indonesia
Sriyana Sriyana  -  Program Studi Program Profesi Insinyur Fakultas Teknik, Universitas Diponegoro, Jl. Prof. Sudarto, SH, Tembalang, Semarang, Indonesia 50275, Indonesia
Amelia Kusuma Indriastuti  -  Program Studi Program Profesi Insinyur Fakultas Teknik, Universitas Diponegoro, Jl. Prof. Sudarto, SH, Tembalang, Semarang, Indonesia 50275, Indonesia
Hanna Chintya Febriani Gunawan  -  Program Studi Program Profesi Insinyur Fakultas Teknik, Universitas Diponegoro, Jl. Prof. Sudarto, SH, Tembalang, Semarang, Indonesia 50275, Indonesia
Received: 28 Mar 2026; Revised: 24 Apr 2026; Accepted: 30 Apr 2026; Available online: 30 Apr 2026; Published: 8 Sep 2026.

Citation Format:
Abstract

Infrastruktur jalan yang ideal membutuhkan konstruksi yang memenuhi standar dan pemeliharaan rutin untuk menjamin pelayanan yang aman, lancar dan berkelanjutan. Namun dalam praktiknya, pencapaian kondisi ideal ini sering menemui kendala, salah satunya adalah kegagalan dalam memenuhi standar kepadatan campuran beraspal. Penelitian ini bertujuan mengidentifikasi akar penyebab ketidaktercapaian kepadatan tersebut dengan studi kasus pada beberapa ruas jalan di salah satu kabupaten kota di Provinsi Kalimantan Utara. Metode penelitian mencakup observasi lapangan, wawancara, serta pengambilan dan pengujian sampel. Hasilnya mengonfirmasi bahwa sejumlah ruas jalan memang gagal mencapai tingkat kepadatan yang disyaratkan. Kegagalan ini disebabkan oleh banyak faktor, utamanya pemahaman stakeholder pelaksana pekerjaan yang lemah, sistem pengawasan yang tidak ketat dan dokumentasi proses kerja yang minim. Kelemahan ini terjadi secara merata di seluruh tahapan, mulai dari penyiapan material, produksi campuran aspal, hingga penghamparan dan pemadatan di lokasi. Sebagai solusi, penelitian ini merekomendasikan dua hal, yaitu penggunaan daftar periksa (checklist) untuk memandu para stakeholder pelaksana pekerjaan dalam melaksanakan setiap langkah kerja guna mencapai kepadatan yang sesuai spesifikasi dan usulan melakukan pengawasan secara ketat dan akuntabel untuk menjamin stakeholder pelaksana pekerjaan memenuhi semua item dalam daftar periksa dan melaksanakan pekerjaan dengan menjunjung tinggi moral dan etika profesi.

 

Kata kunci: kepadatan, campuran beraspal, daftar periksa, pengawasan mutu, stakeholder pelaksana pekerjaan

Article Metrics:

Article Info
Section: Articles
Language : ID
  1. Beainy, F., Singh, D., Commuri, S., & Zaman, M. (2014). Laboratory and field study on compaction quality of an asphalt pavement. International Journal of Pavement Research and Technology, 7(5), 317. doi: 10.6135/IJPRT.ORG.TW/2014.7(5).317
  2. Di Maddaloni, F., & Davis, K. (2017). The influence of local community stakeholders in megaprojects: Rethinking their inclusiveness to improve project performance. International journal of project management, 35(8), 1537-1556. doi: 10.1016/J.IJPROMAN.2017.08.011
  3. Direktorat Jenderal Bina Marga. (2020). Spesifikasi Umum Jalan dan Jembatan Revisi 2. Kementerian Pekerjaan Umum dan Perumahan Rakyat
  4. Islam, S. S., Singh, S. K., Ransinchung, G. D., & Ravindranath, S. S. (2021). Effect of property deterioration in SBS modified binders during storage on the performance of asphalt mix. Construction and building materials, 272, 121644. doi: 10.1016/J.CONBUILDMAT.2020.121644
  5. Kamaludin, T. M., Patunrangi, J., & Renata, B. D. (2025). Analysis of Factors Influencing Asphalt Pavement Work Quality in the Bungku – Bahodopi – Southeast Sulawesi Border Road Preservation Project. Engineering And Technology Journal, 10(6), pp. 5416–5424. doi: 10.47191/ETJ/V10I06.13
  6. Kementerian Pekerjaan Umum Republik Indonesia. (2007). Pedoman pelaksanaan lapis campuran beraspal panas, pp. 1–42
  7. Li, W., Cao, W., Ren, X., Lou, S., Liu, S., & Zhang, J. (2022). Impacts of aggregate gradation on the volumetric parameters and rutting performance of asphalt concrete mixtures. Materials, 15(14), 4866. doi: 10.3390/MA15144866
  8. Muhammad, Syuhada, A., Huzni, S., & Fuadi, Z. (2019, May). Study of temperature loss of Hot Mix Asphalt during transportation. In IOP Conference Series: Materials Science and Engineering (Vol. 523, No. 1, p. 012083). IOP Publishing. doi: 10.1088/1757-899X/523/1/012083
  9. Mulyono, A. T. (2006). Kinerja Pemberlakuan Standar Mutu Perkerasan pada Peningkatan dan Pemeliharaan Jalan Nasional–Propinsi. Media Komunikasi Teknik Sipil, 14(3), 309-328. doi: 10.14710/MKTS.V14I3.3956
  10. Rahangdale, G., & Nigam, S. (2020). Engineering attributes affecting quality of road construction. International Journal of Engineering Applied Sciences and Technology, 5(7), 242-247. doi: 10.33564/ijeast.2020.v05i07.037
  11. Rotimi, A. (2024). A Review Of Road Pavement Failure: A Case Study Of Nigerian Road. Advanced Journal of Science, Technology and Engineering, 4(2), 8-23.doi: 10.52589/ajste-mvcd6edz

Last update:

No citation recorded.

Last update:

No citation recorded.