skip to main content

Optimalisasi Kapasitas Produksi Line Press Forming by Modifikasi Arm Robot Handling System

*Antonius Simalango  -  Program Studi Program Profesi Insinyur Fakultas Teknik Universitas Diponegoro, Indonesia
P Paryanto  -  Program Studi Program Profesi Insinyur, Fakultas Teknik, Universitas Diponegoro , Indonesia
S Sulardjaka  -  Program Studi Program Profesi Insinyur, Fakultas Teknik, Universitas Diponegoro , Indonesia
Received: 4 Aug 2023; Revised: 20 Sep 2023; Accepted: 27 Sep 2023; Available online: 28 Sep 2023; Published: 16 Jul 2024.

Citation Format:
Abstract

Optimizing the Production Capacity of the Press Forming Line by Modifying the Arm Robot Handling System. Competition in the industrial world today is getting tighter, so all companies must be able to manage their business as efficiently and effectively as possible. For companies which are engaged in manufacturing, companies must be able to reduce unnecessary costs, maintain product quality, and increase speed and accuracy in the process of producing their products. The current condition of the PT Astra Honda Motor fuel tank line press requires a capacity up of 200 sets per day. Improvements were made to the auto equipment setting activity in the form of replacement of construction and material handling robot arm systems. The losstime contained in the installed capacity setting of the press production line is reduced by 700 seconds per shift. This increases the production capacity by 210 sets for 3 shifts, so that it can meet the capacity shortage by 200 sets.

 

Keywords: production, capacity, press, losstime, material handling

 

Abstrak

 

Persaingan di dunia industri saat ini semakin ketat dan secara tidak langsung menuntut semua perusahaan agar dapat menjalankan bisnisnya dengan seefektif dan seefisien mungkin. Pada perusahaan-perusahaan yang bergerak dalam bidang manufaktur, mereka harus bisa menurunkan biaya-biaya yang sekiranya tidak perlu, menjaga kestabilan kualitas produk, serta berupaya meningkatkan kecepatan dan ketepatan dalam proses menghasilkan produk-produknya. Kondisi saat ini line press fueltank PT Astra Honda Motor membutuhkan capacity up sebanyak 200 set per hari. Improvement dilakukan pada aktivitas setting equipment auto berupa penggantian konstruksi dan sistem arm robot material handling. Losstime yang terdapat pada setting kapasitas terpasang line produksi press berkurang sebanyak 700 detik per shift-nya. Hal ini meningkatkan kapasitas produksi sebanyak 210 set untuk 3 shift, sehingga mampu memenuhi kekurangan kapasitas sebanyak 200 set sebelumnya.

Fulltext View|Download

Article Metrics:

  1. Chase, Richard B. dan Jacobs, F. Robert. 2005. Operation Management for Competitive Advantages With Global Case. New York: Prentice Hall
  2. Gaspersz, Vincent. 2007. Lean Six Sigma for Manufacturing and Service Industries. Jakarta: Gramedia Pustaka Utama
  3. Handoko.T.Hani. 2001. Manajemen Personalia dan Sumber Daya Manusia. Yogyakarta: BPFE UGM
  4. Johansson M.I. 2006. Materials supply systems design in product development projects. International Journal of Operation & Production Management 26(4), pp. 371-393 Kadim, Abdul. 2017. Penerapan Manajemen Produksi & Operasi Di Industri Manufaktur. Jakarta : Penerbit Mitra Wacana Media
  5. Kusuma, Hendra. 2001. Perencanaan dan Pengendalian Produksi. Yogyakarta : Andi
  6. Liker, J. 2004. The Toyota Way: 14 Management Principles from The World’s Greatest Manufacture. New York : McGraw Hill
  7. Nasution, Hakim Arman dan Prasetyawan,Yudha. 2008. Perencanaan dan Pengendalian Produksi. Yogyakarta: Graha Ilmu
  8. Pycraft, M., Singh, H. and Phihlela, K. 2000. Operations Management. Pretoria: Pearson Education. Sinulingga, Sukaria. 2008. Pengantar Teknik Industri. Yogyakarta : Graha Ilmu
  9. Subagyo, Drs. Pangestu. 2000. Manajemen Operasi. Yogyakarta: BPFE-Yogyakarta
  10. Sukanto Reksohadiprojo dan Indriyo Gitosudarmo. 2000. Manajemen Produksi. Yogyakarta: BPFE UGM