skip to main content

ANALISA JOINT ERECTION KONSTRUKSI BAJA BLOCK B05 & B07 KAPAL PATROLI POLISI 63 METER DENGAN MOBILE CRANE 72.000 TON

*Samuel Febriary Khristyson  -  Teknologi Perancangan dan Konstruksi Kapal, Sekolah Vokasi Universitas Diponeogoro, Indonesia
Suryo Hadi Leksono  -  Teknologi Perancangan dan Konstruksi Kapal, Sekolah Vokasi Universitas Diponeogoro, Indonesia

Citation Format:
Abstract
The construction of modern vessels is already different from traditional ships, modern vessels are usually constructed by block methods where the ship is constructed from the pieces and starts from the centre piece. The construction with this method was used on the police patrol ship 63m . The process of unification of the block was done after the block was finished through the assembly process and also passed several parameters, the parameters that must be achieved and implemented before the process of the joint erection is the identification of the material, scantling Check, welding check, dimension check, readiness of the crane, building berth, number of boat blocks, and Indetification Risk. In the implementation of the block construction unification process using the help of the crane and the Trailer to move the blocks from the jig table to the building birth. The selection of the crane itself is based on the block load, being for the number of eye plates when the joint erection depends on the number and capacity of the crane used. And in this case the load of each eye plate is 35.26 kN and maximum stress 376,30 Mpa  in block B05 and then 23, 51 kN in and maximum stress  313,30 Mpa in  block B07. After the joint erection is still needed to be checked, the things to be checked are dimensional check, plate and member flatness, member straightness, Visual weld inspection, and non-destructive test according to WPS.
Fulltext View|Download
Funding: Sekolah Vokasi Universitas Diponegoro

Article Metrics:

  1. Ariany, Z., Hendra, A., & Febriary, S. (2018). STANDART PELAYANAN MINIMAL (SPM) DAN SISTEM LASING PADA KAPAL RO-RO UNTUK KESELAMATAN TRANSPORTASI PENYEBRANGAN LAUT (Studi Kasus KMP. LEGUNDI). GEMA TEKNOLOGI, 20(1), 26. https://doi.org/10.14710/gt.v20i1.21081
  2. Hutama, M. H., Yudo, H., & Iqbal, M. (2016). ANALISA KELELAHAN RANTAI JANGKAR DENGAN MENGGUNAKAN METODE ELEMEN HINGGA. Jurnal Teknik Perkapalan, 4(3). Retrieved from https://ejournal3.undip.ac.id/index.php/naval/article/view/14754
  3. Hwang, I. H., Kim, Y., Lee, D. K., & Shin, J. G. (2014). Automation of block assignment planning using a diagram-based scenario modeling method. International Journal of Naval Architecture and Ocean Engineering, 6(1), 162–174. https://doi.org/10.2478/IJNAOE-2013-0170
  4. Kang, M., Seo, J., & Chung, H. (2018). Ship block assembly sequence planning considering productivity and welding deformation. International Journal of Naval Architecture and Ocean Engineering, 10(4), 450–457. https://doi.org/10.1016/J.IJNAOE.2017.09.005
  5. Kurdi, O. (2019). Pemilihan Jenis Pembebanan Statik untuk Analisa Tegangan Heavy Duty Truck Chassis Menggunakan Metode Elemen Hingga. ROTASI, 21(3), 181. https://doi.org/10.14710/rotasi.21.3.181-186
  6. Park, J., An, G., & Lee, H. (2019). Influence on properties of base metal after elimination of lifting-lug member in a dissimilar welding between steel base and steel lifting lug. International Journal of Naval Architecture and Ocean Engineering, 11(2), 858–864. https://doi.org/10.1016/J.IJNAOE.2019.04.003
  7. Utomo, B., & Khristyson, S. F. (2019). STUDI PERANCANGAN PROPULSI KAPAL PETI KEMAS 100 TEUS. Gema Teknologi, 20(2), 46. https://doi.org/10.14710/gt.v20i2.21633
  8. Wei, Y., Ding, Z., Huang, H., Yan, C., Huang, J., & Leng, J. (2019). A non-contact measurement method of ship block using image-based 3D reconstruction technology. Ocean Engineering, 178, 463–475. https://doi.org/10.1016/J.OCEANENG.2019.03.015

Last update:

No citation recorded.

Last update:

No citation recorded.