@article{POTENSI29185, author = {Ivory Quthub Manar and Siti Husnul Hotimah and Asri Nurdiana and Bambang Setiabudi}, title = {Perencanaan Ulang Jembatan Jetak Bojonegoro Menggunakan Struktur PCI – Girder dan Penerapan Building Information Modelling (BIM) 5D}, journal = {Jurnal Proyek Teknik Sipil}, volume = {9}, number = {1}, year = {2026}, keywords = {}, abstract = { The Jetak Bridge in Bojonegoro, originally a Steel Box Girder type, was redesigned using a Precast Concrete I-Girder (PCI-Girder) system to improve safety and serviceability. The new design applies BIM 5D for integrated analysis, covering structural calculation, 3D modelling, scheduling, and cost estimation. Structural planning refers to SNI 1725:2016 and related standards. The redesigned bridge has a 50 m span and 19.3 m width, supported by PCI-Girders and pile foundations. Analysis results confirm that the structure meets strength, stability, and serviceability requirements. The BIM 5D workflow produced reliable outputs for quantity take-off, cost, and project duration. The estimated construction cost is IDR 30.36 billion with a duration of 40 weeks. This study highlights that BIM 5D enhances accuracy, transparency, and efficiency in bridge planning and implementation. }, issn = {2654-4482}, pages = {1--17} doi = {10.14710/potensi.2026.29185}, url = {https://ejournal2.undip.ac.id/index.php/potensi/article/view/29185} }
Refworks Citation Data :
The Jetak Bridge in Bojonegoro, originally a Steel Box Girder type, was redesigned using a Precast Concrete I-Girder (PCI-Girder) system to improve safety and serviceability. The new design applies BIM 5D for integrated analysis, covering structural calculation, 3D modelling, scheduling, and cost estimation. Structural planning refers to SNI 1725:2016 and related standards. The redesigned bridge has a 50 m span and 19.3 m width, supported by PCI-Girders and pile foundations. Analysis results confirm that the structure meets strength, stability, and serviceability requirements. The BIM 5D workflow produced reliable outputs for quantity take-off, cost, and project duration. The estimated construction cost is IDR 30.36 billion with a duration of 40 weeks. This study highlights that BIM 5D enhances accuracy, transparency, and efficiency in bridge planning and implementation.
Article Metrics:
Last update:
Jurnal Proyek Teknik Sipil is indexed in:
View My Stats