Analisis Total Productive Maintenance Menggunakan Metode Overall Equipment Effectiveness (OEE) sebagai Baseline Kebijakan Perawatan Laboratorium Simulasi dan Komputasi

1Departemen of Industrial Engineering, Universitas Negeri Gorontalo, Jl. Prof. Dr.Eng B.J. Habibie, Desa Moutong, Kecamatan TIlongkabila, Kabupaten Bonebolango, Provinsi Gorontalo, Indonesia

2Human Resource Department (HRD), P.T. Banggai Sentral Sulawesi, Luwuk, Indonesia, Indonesia

Open Access Copyright 2026 Jurnal Pengelolaan Laboratorium Pendidikan

Creative Commons License
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.

Citation Format:
Abstract

The Simulation and Computing Laboratory of the Industrial Engineering Department, Universitas Negeri Gorontalo, is the busiest among six existing laboratories, serving two undergraduate programs Industrial Engineering and Mechanical Engineering Education alongside the national student admission selection test via Computer Assisted Test. Research applying OEE in educational laboratories remains sparse; most studies report values in the 64–78% range, well short of the 85% world-class standard, with none addressing split-start parallel scheduling or recording Reduced Speed Loss in CAD applications as a distinct category. This study measures equipment performance using the Overall Equipment Effectiveness (OEE) method within a Total Productive Maintenance (TPM) framework as the basis for laboratory maintenance policy formulation. Data were collected through structured observation and semi-structured interviews from August to December 2025, covering two scheduling groups: Group A from August 19 and Group B from October 13 2025, one week after mid semester examinations, totaling 199 practical sessions with a Loading Time of 597 hours. OEE measurement produced a baseline of 84.42%, only 0.58 points below the world-class standard, with Availability at 88.89% (gap 1.11 points), Performance Rate at 90.48% (gap 4.52 points), and Quality Rate at 94.97% (gap 4.93 points). Six Big Losses analysis identified Setup and Adjustment Loss as the largest contributor at 66.33 hours (43.30%), followed by Equipment Failure at 56.86 hours (37.12%), together accounting for 80.42% of total quantified losses. Grounded in the OEE baseline and loss distribution map, this study produced three implementation-ready maintenance policy outputs: (1) a five-level tiered Preventive Maintenance schedule from daily to annual, (2) a Laboratory Preparation Standard Operating Procedure mandating a 30-minute pre-session setup to eliminate 66.33 hours of delays per semester, and (3) a three-level operator training module. Full 

Keywords: Total Productive Maintenance; Overall Equipment Effectiveness; Six Big Losses; Jadwal Paralel; Reduced Speed Loss; Laboratorium Komputer Pendidikan.

Article Metrics:

Article Info
Section: Articles
Language : ID
  1. Adinda, P. B., & Suseno. (2025). Evaluasi Pengaruh Autonomous Maintenance terhadap Kinerja Mesin Bubut dalam Penerapan Total Productive Maintenance di PT XYZ implementasi pilar kedua TPM , dimana AM merupakan cara perawatan mesin yang. Jurnal Teknik Mesin, Industri, Elektro Dan Informatika, 4, 117–125. https://doi.org/https://doi.org/10.55606/jtmei.v4i1.4786
  2. Aryanti, F. I., Santoso, T. B., Christian, F. P., Artamifian, D., Studi, P., Kimia, T., Putih, C., & Pusat, J. (2023). Implementasi Total Productive Maintenance ( TPM ) dalam Penerapan Overall Equipment Effectiveness ( OEE ) di PT . XYZ. Journal of Community Services in Sustainability, 1(1), 1–8. https://doi.org/https://doi.org/10.52330/jocss.v1i1.135
  3. Doyer, I., & Bean, W. L. (2023). As easy as OEE : Enabling productivity improvement in schools by using Overall Equipment Effectiveness as framework for quantitative classroom data analysis. International Journal of Lean Six Sigma, 14(5), 1055–1074. https://doi.org/https://doi.org/10.1108/IJLSS-03-2022-0057
  4. Ganep, M., & Erik Nugraha, A. (2022). Penerapan Total Productive Maintenance (TPM) Pada Perawatan Mesin Cutter di PT. XYZ. Jurnal Ilmiah Wahana Pendidikan, 8(June), 205–219. https://doi.org/https://doi.org/10.5281/zenodo.6645451
  5. Hallioui, A., Herrou, B., Katina, P. F., Santos, R. S., Egbue, O., Jasiulewicz-kaczmarek, M., Soares, J. M., & Marques, P. C. (2023). A Review of Sustainable Total Productive Maintenance ( STPM ). MDPI Journal, 15. https://doi.org/https://doi.org/10.3390/su151612362
  6. Hansen, R. C. (2001). Overall Equipment Effectiveness: A Powerful Production/Maintenance Tool for Increased Profits (J. Carleo & R. Weinstein (eds.); 1st ed.). Industrial Press
  7. Imai, M. (1986). Kaizen: The key to Japan’s competitive success (1st ed.). McGraw-Hill Education
  8. Iskandar, S., & Padmakusumah, R. R. (2023). Jurnal Impresi Indonesia ( JII ) Analisis Progress Implementasi TPM ( Total Productive Maintenance ) dan Proyeksi Manfaatnya bagi Peningkatan Produktivitas ( Studi Kasus pada Perusahaan X ). Jurnal Impresi Indonesia, 2532–2547
  9. Jannahti, A. B., Lasmana, C., & Fauzi, M. (2024). Implementation of Total Productive Maintenance ( TPM ) Using Overall Equipment Effectiveness ( OEE ) Method on HPLC Instruments in Laboratory. Jurnal Teknik Industri : Jurnal Hasil Penelitian Dan Karya Ilmiah Dalam Bidang Teknik Industri, 10(1), 223–230
  10. Muhammad, A. N. F., & Budi, H. (2024). Analisis Penerapan Metode Total Productive Maintenanace berdasarkan Perhitungan OEE dan Faktor Six Big Losses pada Mesin Seamer Hor Yang di PT. XYZ. Jurnal Ilmiah Inovasi, 24(2), 151–156. https://doi.org/10.25047/jii.v24i2.4658
  11. Nakajima, S. (1998). Introduction to TPM : Total Productive Maintenance. Cambridge : Productivity Press
  12. Nurcahyo, R., Dachyar, M., & Habiburrahman, M. (2018). Overall Equipment Effectiveness ( OEE ) at the Laboratory of Structure Testing. In Proceedings of the International Conference on Industrial Engineering and Operations Management (IEOM 2018) (pp. 1080–1090)
  13. Raju, S., Kamble, H. A., & Srinivasaiah, R. (2022). Anatomization of the overall equipment effectiveness ( OEE ) for various machines in a tool and die shop. Journal of Intelligent Manufacturing and Special Equipment, 3(1), 97–105. https://doi.org/10.1108/JIMSE-01-2022-0004
  14. Suzuki, T. (1994). TPM In Process Industries (T. Suzuki (ed.)). CRC Press
  15. Wahyudi, R., Ferdana, R. G., & Nugraha, A. T. (2023). Penerapan Metode Overall Equipment Effectiveness ( OEE ) dan Six Big Losses untuk Mengukur Efektivitas Mesin Packing pada PT . Surya Tsabat Mandiri. Jurnal Optimalisasi Teknik Industri, 09(02), 82–89
  16. Wibowo, P. A., & Padilah, I. (2023). Analisis Overall Equipment Effectiveness (OEE) dan Six Big Losses Pada Mesin Length Adjusment Line 3 Departemen Belt Assy PT XYZ. G-Tech : Jurnal Teknologi Terapan, 7(2), 439–449. https://doi.org/10.33379/gtech.v7i2.2236