skip to main content

LAND ACQUISITION ESTIMATE FOR THE BANDUNG INTRA-URBAN TOLL ROAD (BIUTR) CONSTRUCTION PROJECT

Program Studi Sains Informasi Geografi, Fakultas Pendidikan Ilmu Pengetahuan Sosial, Universitas Pendidikan Indonesia, Jalan Dr. Setiabudhi 229, Sukasari, Kota Bandung, Indonesia

Received: 4 Jun 2025; Accepted: 26 Nov 2025; Available online: 4 Dec 2025; Published: 18 Dec 2025.

Citation Format:
Abstract

The Bandung Intra-Urban Toll Road (BIUTR) serves as the government's initiative to address persistent traffic congestion in Metropolitan areas. However, A critical challenge in realizing this infrastructure is the land acquisition phase, which demands precise estimates and a comprehensive approach. This research aims to calculate the extend and monetary value of land impacted by the construction of BIUTR using a Geographic Information System (GIS) approach and spatial modeling. The research was conducted by establishing a 60-meter buffer zone on both sides of the toll road route as a road space. The  analytical indicate that the BIUTR project will cross 14 sub-districts in Bandung City with a total affecting a total land area of 3,503,671.63 m² and with compensation value of more than IDR 70 trillion. Several sub-districts such as Cinambo, Cibeunying Kidul, and Cibeunying Kaler have high compensation values due to high land values and residential density. Result from his research highlight the necessity of conducting on fostering community engagement to develop a land acquisition strategy that is fair, efficient and minimize potential conflicts. emphasizes the importance of field verification and community participation in formulating a fair, efficient, and conflict-free land acquisition strategy.

 

Keywords : Toll road, land acquisition, GIS, land value estimation, Bandung

Note: This article has supplementary file(s).

Fulltext View|Download |  Research Materials
Peta Kesesuaian Lahan Permukiman Kota Bandung
Subject Kesesuaian Lahan
Type Research Materials
  View (3MB)    Indexing metadata

Article Metrics:

  1. Agustia, V. L., & Haryatiningsih, R. (2024). Analisis Preferensi Komuter terhadap Pilihan Moda Transportasi Bandung Raya. Jurnal Riset Ilmu Ekonomi Dan Bisnis, 4(2), 97–108. https://doi.org/10.29313/jrieb.v4i2.5023
  2. Andriany, V. (2019). Penilaian Ganti Rugi untuk Kepentingan Umum’(Studi Kasus Pembebasan Lahan untuk Tapak Tower PLN). DINAMIS-Journal of Islamic Management and Bussines, 2(2), 56–67
  3. Aswal, M. (2024). Kebijakan Pengembangan Infrastruktur dan Manajemen Umum Untuk Mengatasi Kemacetan di Kota Bandung. Jurnal Rekayasa Hijau, 8(2), 200–216. https://doi.org/10.26760/jrh.v8i2.200-216
  4. Haryono, R., & Daris, A. (2024). PEMBEBASAN LAHAN TOL AKSES PELABUHAN PATIMBAN KABUPATEN SUBANG. Jurnal Administrasi Perkantoran Dan Kesekretariatan, 2(2), 1–5
  5. Listyaningsih, D., & Utomo, C. (2014). Pengaruh Keterlambatan Pembebasan Lahan Terhadap Keputusan Investasi Proyek Jalan Tol Surabaya-Mojokerto. Jurnal Teknik Pomits, 3(2), 43–46
  6. Nur Hasanah, S., Mahani, I., & Gayatri Pradoto, R. K. (2023). Analisis Dampak Pemberian Jaminan Risiko Keterlambatan Pengadaan Tanah Terhadap Kelayakan Finansial Proyek Jalan Tol di Indonesia(Studi Kasus: Proyek Jalan Tol Jakarta-Cikampek II Selatan). Journal of Civil Engineering, Building and Transportation, 7(1), 283–292. http://ojs.uma.ac.id/index.php/jcebt
  7. Setiawan, A., Rokhmawati, A., & Ingsih, I. S. (2024). Analisis Kesesuaian Lahan untuk Lokasi Pengembangan Permukiman Menggunakan Metode Skoring (Studi Kasus: Kecamatan Moncongloe Kabupaten Maros). Jurnal Rekayasa Sipil, 14(2), 416–425
  8. Setiawan, H. (2023). Analisis Tingkat Kesesuaian Lahan Permukiman Berdasarkan Jaringan Jalan di Kota Jambi. Geodika: Jurnal Kajian Ilmu Dan Pendidikan Geografi, 7(2), 186–195. https://doi.org/10.29408/geodika.v7i2.15901
  9. Subagijo, D., Sampurna, H., Putra, J., Hirwo, N., & Hasan, D. (2025). Evaluasi Estimasi Biaya Tahap Konseptual pada Proyek Pasar Ikan Modern (PIM) Muara Baru dengan Metode Parametrik. Indonesian Research Journal on Education, 5(1), 848–856
  10. Winarda, R. Z., Mardiyanto, J., & Sutarni, N. (2021). Pelaksanaan Pengadaan Tanah Untuk Pembangunan Jalan Tol Yogyakarta - Solo Di Kabupaten Boyolali (Studi Kasus Pembangunan Jalan Tol Kulon Progo Yogyakarta-Solo). Jurnal Bedah Hukum, 5(2), 202–221. https://doi.org/10.36596/jbh.v5i2.661
  11. Yulianti, T. E. (2025). Bandung Kota Termacet, Perjalanan 10 Km Butuh 32 Menit. Detik Jabar. https://www.detik.com/jabar/berita/d-7778583/bandung-kota-termacet-perjalanan-10-km-butuh-32-menit#:~:text=Bandung Kota Termacet di Indonesia,km: 25 menit 31 detik
  12. Yumame, O. O., Pramono, S., & Pramudiana, I. D. (2025). Analisis Dampak Transportasi Rel terhadap Penurunan Tingkat Kemacetan di Jakarta. Jurnal Pendidikan Dan Ilmu Sosial Volume, 3(1), 265–283

Last update:

No citation recorded.

Last update:

No citation recorded.